Skip to main content

Request an Inspection

Basic Text

Requests for Inspection must be made before 12:00 Noon the day prior to the date of Inspection

Requirements

  • Permit number or work order number
  • Job title
  • Valid USA Dig number
  • Address or location of project will be required information to schedule an inspector.

The Bureau of Contract Administration Dispatch Group is responsible for the daily scheduling of inspections by Contractors and Bureau Inspectors in the Metropolitan, Valley, West Los Angeles, and Harbor areas of the City.

This group is responsible for the scheduling of inspections of Class A and B permits, Cash Contracts, Sewer Connection permits, General Deposit permits, Special Deposit permits, Utility permits Excavation permits, and batch plant inspection throughout the City.

Dispatch also provides inspection schedules for lateral support permits, which are permits to shore up the public right of way when developers are excavating large deep areas for private construction of buildings or garages.

Most of these permits are taken out by the various private developers, water, power, telephone and cable companies that service the City.

Dispatch System Schedule

Please use the dropdown options below and click on "Search" to filter by District, Job Type, Work Order/Permit, or Inspector.

  • The information on this table is accurate as of 12:00 noon the day prior to the date of inspection. On Fridays, this table is updated to show the weekend and Monday schedule and is accurate as of 12:00 noon on that Friday prior to the weekend/Monday.
  • Click on the District dropdown to filter by Metro East, Metro West, or Valley districts.
  • Click on the Job Type dropdown to filter by Materials Control (MC) or Shop Fabrication (SF), or Permit Type.
  • Click on the Inspection Date to filter by Saturday, Sunday, or Monday inspections if needed.
  • Click on the Inspector dropdown to filter by Inspector assigned.
  • Enter Work Order/Permit in the specific input box to filter by Work Order/Permit.
  • Click the "Reset" button to clear filters.

For inspectors, please go to the Dispatch Application for more up-to-date information if needed.

For customers, please go to the Appointment Request page for any requests or information..

District Inspection District Job Type WO/Permit Address Job Title T.B. Map Onsite Contact Time Plant/Work Quantity Unit Inspector Sort descending Material Type Line No.
Valley 9 U 2026812319 16115 Vanowen St Woodley Av Van Nuys CA 91406 #3 water meter vault 531 6F EDGAR MEZA 562-332-7144 SE PIPELINE 11/16/26, 12:30 PM CONCRETE Teddy Wipaghathagit 859688VA
Valley 9 U 2026812451 23046 Burbank Blvd Los Angeles CA 91367 B123_A05EFSP_IFP_REL 0-5_LTID 51066 559 2G william h 909-256-9419 VCI 11/16/26, 1:30 PM micro trench Teddy Wipaghathagit 859399VA
Valley 9 U 2026811528 4838 N. ZELZAH AVE. 91316 VALLEY VISTA BLVD. Los Angeles CA 91316 B318 REL 0-2 A05BHP8 LTID 50729 (PO #1228961) 561 4A Ernesto Galaviz 909-788-3326 VCI CONSTRUCTION 11/16/26, 9:00 AM FINAL INSPECTION FOR GROUND BD IN PARKWAY Teddy Wipaghathagit 859303VA
Valley 9 U 2026811418 4671 ALONZO AVE. 91316 WHITE OAK PL. Los Angeles CA 91316 B318 REL 0-3 A05BHP8 LTID 50729 (PO #1228961) 561 4B Ernesto Galaviz 909-788-3326 VCI CONSTRUCTION 11/16/26, 9:00 AM FINAL INSPECTION FOR GROUND BED IN PARKWAY Teddy Wipaghathagit 859300VA
Valley 9 U 2026811411 4775 N. WHITE OAK PL. 91316 YARMOUTH AVE. Los Angeles CA 91316 B318 REL 0-1 A05BHP8 LTID 50729 (PO #1228961) 561 4B Ernesto Galaviz 909-788-3326 VCI CONSTRUCTION 11/16/26, 9:00 AM FINAL INSPECTION FOR GROUND BED IN PARKWAY Teddy Wipaghathagit 859298VA
Valley 9 U 2026811401 17828 VANOWEN ST ZELZAH AVE Los Angeles CA 91335 B318 A05ESXQ 1 OF 1 DAMG REL 0 LTID 50629 531 6A Ernesto Galaviz 909-788-3326 VCI CONSTRUCTION 11/16/26, 9:00 AM FINAL INSPECTION Teddy Wipaghathagit 859294VA
Valley 9 U 2026812027 17075 W BURTON ST N AMESTOY AVE and W BURTON ST Los Angeles CA 91406 54499 A05B85Z 531 2C Ernesto Galaviz 909-788-3326 VCI CONSTRUCTION 11/16/26, 9:00 AM FINAL INSPECTION Teddy Wipaghathagit 859280VA
Valley 9 U 2026812252 20855 W Valerio St Los Angeles Ca 91306 TWC-Z3-6408295 (10782538908-CO01) 530 4C Fine, Rick 818-462-4162 Wiring Connection 11/16/26, 10:00 AM Preconstruction Meeting Teddy Wipaghathagit 858937VA
Valley 9 U 2026811246 6524 GERALD AVE HAYNES ST Los Angeles CA 91406 B402 A05BNTB 3 OF 3 IFP REL 0 LTID 50572 531 6E Ernesto Galaviz 909-788-3326 VCI CONSTRUCTION 11/16/26, 9:00 AM continue work inspection. asphalt restoration Teddy Wipaghathagit 858934VA
Valley 9 U 2026812491 22171 MARYLEE ST. FARRALONE AVE. Woodland Hills CA 91367 559 1J Victor 909-544-1108 Henkels & McCoy 11/16/26, 9:00 AM Install anode Teddy Wipaghathagit 858837VA