Skip to main content

Request an Inspection

Basic Text

Requests for Inspection must be made before 12:00 Noon the day prior to the date of Inspection

Requirements

  • Permit number or work order number
  • Job title
  • Valid USA Dig number
  • Address or location of project will be required information to schedule an inspector.

The Bureau of Contract Administration Dispatch Group is responsible for the daily scheduling of inspections by Contractors and Bureau Inspectors in the Metropolitan, Valley, West Los Angeles, and Harbor areas of the City.

This group is responsible for the scheduling of inspections of Class A and B permits, Cash Contracts, Sewer Connection permits, General Deposit permits, Special Deposit permits, Utility permits Excavation permits, and batch plant inspection throughout the City.

Dispatch also provides inspection schedules for lateral support permits, which are permits to shore up the public right of way when developers are excavating large deep areas for private construction of buildings or garages.

Most of these permits are taken out by the various private developers, water, power, telephone and cable companies that service the City.

Dispatch System Schedule

Please use the dropdown options below and click on "Search" to filter by District, Job Type, Work Order/Permit, or Inspector.

  • The information on this table is accurate as of 12:00 noon the day prior to the date of inspection. On Fridays, this table is updated to show the weekend and Monday schedule and is accurate as of 12:00 noon on that Friday prior to the weekend/Monday.
  • Click on the District dropdown to filter by Metro East, Metro West, or Valley districts.
  • Click on the Job Type dropdown to filter by Materials Control (MC) or Shop Fabrication (SF), or Permit Type.
  • Click on the Inspection Date to filter by Saturday, Sunday, or Monday inspections if needed.
  • Click on the Inspector dropdown to filter by Inspector assigned.
  • Enter Work Order/Permit in the specific input box to filter by Work Order/Permit.
  • Click the "Reset" button to clear filters.

For inspectors, please go to the Dispatch Application for more up-to-date information if needed.

For customers, please go to the Appointment Request page for any requests or information..

District Inspection District Job Type WO/Permit Address Job Title T.B. Map Onsite Contact Time Plant/Work Quantity Unit Inspector Sort descending Material Type Line No.
Valley 8 B BR205926 5023 Ventura Canyon blvd. Los Angeles CA 91423 VENTURA CANYON AVE (W/S) 25' TO 125' S/O HESBY ST - (PM 2019-3186) 562 3C Barry Palmer 213-494-5723 California Paving & Grading Co., Inc. 7/20/26, 9:00 AM SDWLK GRADE / FORM INSPECTION & CONCRETE PLCMNT. Raul Rocha 810841VA
Metro East 4b CCI E1908099 2934 E Cesar E Chavez Ave, Los Angeles, CA 90033 Boyle Heights/Cesar Chavez Great Streets -Brittania St. to Evergreen Ave. (DOT Proj) Justin Lianoz 323-718-3613 Access Pacific Inc. 7/20/26, 7:00 AM Concrete Pour for SW at Area 12 Richard Hollman 811873ME
Metro East 4b CCI E700239F 2934 E Cesar E Chavez Ave, Los Angeles, CA 90033 ATP Cycle 3- Downtown Los Angeles Arts District Pedestrian and Cyclist Safety Project Justin Lianoz 323-718-3613 Access Pacific Inc. 7/20/26, 7:00 AM Concrete Pour for Sidewalk at Area 12. Richard Hollman 811845ME
Metro East 2e B BR004576 3203 Johnston Los Angeles CA 90031 Johnston St. (W/S) from 569' to 622' (NO) Montecito St. (ZA-2019-593-ZAD) 595 6B Francisco Bringas 323-767-6981 Francisco Bringas 7/20/26, 8:00 AM FORMS CURB AND GUTTER Robert Holmes 811808ME
Metro East 2d CCI E1909283 581 MT WASHINGTON DRIVE 90065 Mt. Washington Drive (581 and 805) Bulkheads Octavio 626-488-4024 Clarke Contracting Corporation 7/20/26, 8:00 AM continue work Robert Holmes 811394ME
Metro East 2c CCI E1909217 3305 LARISSA DRIVE, LOS ANGELES, CA 90026 Larissa Drive (3305) Slope Mitigation - RAP JESSE MARQUEZ 310-505-6968 Jilk Heavy Construction 7/20/26, 8:00 AM CONSTRUCT SLOPE IMPROVEMENTS Robert Holmes 811387ME
Metro East 2d B BR003877 2600-2750 Riverside Dr., Los Angeles CA 90032 RIVERSIDE DR. (SS) FROM 300' TO 1288' W/O FLETCHER DR. (VOLUNTARY IMPROVEMENT) 594 3D Barry Palmer 213-494-5723 California Paving & Grading Co., Inc. 7/20/26, 9:00 AM GRADING Robert Holmes 810817ME
Metro East 2c B BR005016 1953 Rockford rd silver lake CA 90026 Rockford Rd (WS) from 334' to 388' N/O Silverlake Blvd. 594 5D Sean Scott 661-313-3423 Alpha structural 7/20/26, 11:00 AM Retaining wall encroaching along the public right away of silver lake rd Robert Ishiki 811867ME
Metro East 2b CCI E1908671 W 12th St & S Catalina St Los Angeles, CA 90006 AHSC Round 3 - Elden Elms STI & TRA Improvements SALLY SERRANO 562-244-2611 EXCEL PAVING COMPANY 7/20/26, 7:00 AM GRADING Robert Ishiki 811824ME
Metro East 2a B BR004945 1200 N Cahuenga Blvd. Los Angeles CA 90038 CAHUENGA BLVD & LEXINGTON AVE (NE CORNER) (CPC-2021-10170-GPA-ZC-HD) 593 5F Mark Diaz 714-931-4087 KPRS 7/20/26, 9:00 AM Go over new ICA for the B permit Robert Ishiki 811798ME