Skip to main content

Request an Inspection

Basic Text

Requests for Inspection must be made before 12:00 Noon the day prior to the date of Inspection

Requirements

  • Permit number or work order number
  • Job title
  • Valid USA Dig number
  • Address or location of project will be required information to schedule an inspector.

The Bureau of Contract Administration Dispatch Group is responsible for the daily scheduling of inspections by Contractors and Bureau Inspectors in the Metropolitan, Valley, West Los Angeles, and Harbor areas of the City.

This group is responsible for the scheduling of inspections of Class A and B permits, Cash Contracts, Sewer Connection permits, General Deposit permits, Special Deposit permits, Utility permits Excavation permits, and batch plant inspection throughout the City.

Dispatch also provides inspection schedules for lateral support permits, which are permits to shore up the public right of way when developers are excavating large deep areas for private construction of buildings or garages.

Most of these permits are taken out by the various private developers, water, power, telephone and cable companies that service the City.

Dispatch System Schedule

Please use the dropdown options below and click on "Search" to filter by District, Job Type, Work Order/Permit, or Inspector.

  • The information on this table is accurate as of 12:00 noon the day prior to the date of inspection. On Fridays, this table is updated to show the weekend and Monday schedule and is accurate as of 12:00 noon on that Friday prior to the weekend/Monday.
  • Click on the District dropdown to filter by Metro East, Metro West, or Valley districts.
  • Click on the Job Type dropdown to filter by Materials Control (MC) or Shop Fabrication (SF), or Permit Type.
  • Click on the Inspection Date to filter by Saturday, Sunday, or Monday inspections if needed.
  • Click on the Inspector dropdown to filter by Inspector assigned.
  • Enter Work Order/Permit in the specific input box to filter by Work Order/Permit.
  • Click the "Reset" button to clear filters.

For inspectors, please go to the Dispatch Application for more up-to-date information if needed.

For customers, please go to the Appointment Request page for any requests or information..

District Inspection District Job Type WO/Permit Address Job Title T.B. Map Onsite Contact Time Plant/Work Quantity Unit Inspector Sort descending Material Type Line No.
Valley 8 B BR206166 3651 N Regal Place, LOS ANGELES CA 90068 REGAL PLACE (W/S) 345' TO 508' S/O CAHUENGA BLVD WEST - (TR 83276) 563 7B BARRY PALMER 213-494-5723 CALIF. PAVING & GRADING 10/26/26, 9:30 AM SDWLK GRADE INSPECTION Jesus Rascon 850459VA
Valley 8 B BR004783 6335 La punta Dr 90068 Quebec Dr. (N/S) from 17' to 149' (WO) La Punta Dr.(ZA-2019-110-ZAD/Hillside Ord.) 593 2F Razmik 818-339-6666 Razmik Construction 10/26/26, 11:00 AM Pour Concrete Jesus Rascon 849929VA
Valley 8 B BR206223 4141 Whitsett Ave., Studio City, CA 91604 WHITSETT AVE & VALLEY SPRING LANE (S/W CORNER) - (GENERAL IMPROVEMENTS) 562 5F Richard Oh 562-577-7154 MATT Construction 10/26/26, 7:00 AM Continue Demo, Grading, Formwork at the Valley Spring and Whitsett Intersection. Jesus Rascon 849697VA
Valley 9 B BR205834 18233 ERWIN ST., LOS ANGELES CA 91335 ERWIN ST (N/S) 290' TO 360' E/O ETIWANDA AVE - (PM 2007-2243) 530 7J BARRY PALMER 213-494-5723 CALIF. PAVING & GRADING 10/26/26, 9:00 AM SDWLK GRADE INSPECTION Joel Gallegos 850462VA
Valley 9 B BR206273 22822 W. Ventura Blvd. Woodland Hills, CA. 91364 VENTURA BLVD & RIGOLETTO ST (S/E CORNER)(ZA-2022-2788-CU-SPP-SPPA-SPR-WDI) 559 3H David Gaston 714-719-9022 KDC Construction 10/26/26, 11:00 AM Base compaction testing Joel Gallegos 850310VA
Valley 8 A 2026001908 4219 N SAUGUS AVE, LOS ANGELES CA 91403 Ref No : 128791 561 5H NISS 213-268-2321 ROYAL X ARTSCAPE 10/26/26, 8:00 AM DRVWY / SDWLK GRADE / FORM INSPECTION John (D8 A / S ) Jones 851041VA
Valley 8 A 2026000946 5823 Hazeltine Ave, Sherman Oaks, CA 91401 Ref No : 126183 562 1B Omar Rojas 818-397-0635 omar rojas 10/26/26, 10:30 AM Pre construction meeting / pre inspection John (D8 A / S ) Jones 850643VA
Valley 8 A 2026001096 5823 Hazeltine Ave, Sherman Oaks, CA 91401 Ref No : 126509 562 1B omar rojas 818-397-0635 omar rojas 10/26/26, 11:00 AM Pre construction meeting/ Pre-inspection. ( there are 2 seperate permits for 2 lots, lots are next to each other, will schedule seperate pre inspection if neccessary. John (D8 A / S ) Jones 850637VA
Valley 8 A 2026002313 13410 W MAGNOLIA BLVD LOS ANGELES CA 91423 Ref No : 129507 562 2D Isaac Alvarado 818-573-4728 Isaac Alvarado 10/26/26, 12:30 PM PRE ON MEET John (D8 A / S ) Jones 850607VA
Valley 8 A 2026002320 8039 N FULTON AVE, 91605 LOS ANGELES CA 91605 Ref No : 129651 532 2D Gustavo Fajardo 818-391-0275 Omega Contractors Inc. 10/26/26, 10:00 AM Pre-construction meeting for sidewalk and driveway approach repair. John (D8 A / S ) Jones 850524VA