Skip to main content

Request an Inspection

Basic Text

Requests for Inspection must be made before 12:00 Noon the day prior to the date of Inspection

Requirements

  • Permit number or work order number
  • Job title
  • Valid USA Dig number
  • Address or location of project will be required information to schedule an inspector.

The Bureau of Contract Administration Dispatch Group is responsible for the daily scheduling of inspections by Contractors and Bureau Inspectors in the Metropolitan, Valley, West Los Angeles, and Harbor areas of the City.

This group is responsible for the scheduling of inspections of Class A and B permits, Cash Contracts, Sewer Connection permits, General Deposit permits, Special Deposit permits, Utility permits Excavation permits, and batch plant inspection throughout the City.

Dispatch also provides inspection schedules for lateral support permits, which are permits to shore up the public right of way when developers are excavating large deep areas for private construction of buildings or garages.

Most of these permits are taken out by the various private developers, water, power, telephone and cable companies that service the City.

Dispatch System Schedule

Please use the dropdown options below and click on "Search" to filter by District, Job Type, Work Order/Permit, or Inspector.

  • The information on this table is accurate as of 12:00 noon the day prior to the date of inspection. On Fridays, this table is updated to show the weekend and Monday schedule and is accurate as of 12:00 noon on that Friday prior to the weekend/Monday.
  • Click on the District dropdown to filter by Metro East, Metro West, or Valley districts.
  • Click on the Job Type dropdown to filter by Materials Control (MC) or Shop Fabrication (SF), or Permit Type.
  • Click on the Inspection Date to filter by Saturday, Sunday, or Monday inspections if needed.
  • Click on the Inspector dropdown to filter by Inspector assigned.
  • Enter Work Order/Permit in the specific input box to filter by Work Order/Permit.
  • Click the "Reset" button to clear filters.

For inspectors, please go to the Dispatch Application for more up-to-date information if needed.

For customers, please go to the Appointment Request page for any requests or information..

District Inspection District Job Type WO/Permit Address Job Title T.B. Map Onsite Contact Time Plant/Work Quantity Unit Inspector Sort descending Material Type Line No.
Valley 8 B BR205824 14552-14558 ERWIN ST., LOS ANGELES CA 91411 VESPER AVE & ERWIN ST (SE CORNER) -(R-3) (DIR-2019-6323) 532 7A JOSE HURTADO 818-391-3111 S & S PAVING 10/30/26, 10:30 AM COMPACTION SUBGRADE / C & B BASE (BOE EXT.LTR. ON ATTACHMENTS PAGE 10/01/2028) Raul Rocha 852587VA
Valley 8 B BR205926 5023 Ventura Cyn. Los Angeles CA 91423 VENTURA CANYON AVE (W/S) 25' TO 125' S/O HESBY ST - (PM 2019-3186) 562 3C Barry Palmer 213-494-5723 California Paving & Grading Co., Inc. 10/30/26, 8:30 AM grading Raul Rocha 852493VA
Valley 10 CCI E1908343 PLUMMER ST & TAMPA AVE, LOS ANGELES CA 91324 HSIP 8 Left Turn Signal Modification and Median Islands (13 locations ) JORGE MEDINA 562-843-0551 EXCEL PAVING CO 10/30/26, 7:00 AM DEMO & GRADE Rene Valenzuela 853410VA
Metro East 4b CCI E1908099 2734 E Cesar E Chavez Ave, Los Angeles, CA 90033 Boyle Heights/Cesar Chavez Great Streets -Brittania St. to Evergreen Ave. (DOT Proj) Justin Lianoz 323-718-3613 Access Pacific Inc 10/30/26, 9:00 AM Concrete Pour for Area 34 Curb & Gutter/Demo/Subgrade for Area 31/32 Richard Hollman 853421ME
Metro West 5 U 2026851713 Venice Blvd and Mentone Ave 90232 10505 WASHINGTON BL 672 2F Marcos Zamudio 818-402-1558 OL Development 10/30/26, 2:30 PM Inspection for excavation/ base asphalt. Roberta Costello 853466MW
Metro West 5 U 2026850690 2220 BUNDY DR TENNESSEE AV Los Angeles CA 90064 34.5KV CONDUIT REQUIREMENTS 632 5D Anthony Balderas 562-381-5198 Doty Bros Construction 10/30/26, 7:00 AM TCP Inspection Roberta Costello 852959MW
Metro West 5 U 2026504048 1753 N VIEWMONT DR., Los Angeles CA 90069 Z4_PRISM_6996774 (AH/EB) 592 4J PARRIS WATSON 818-207-9091 ADVANCE CABLE 10/30/26, 9:00 AM EXCAVATE / TRENCH TO INSTALL UTLITY VAULT IN PRKWY AREA Roberta Costello 852809MW
Metro West 5 U 2026851667 1068 N MAYBROOK DR SUNDIAL LN Los Angeles CA 90210 2044176318 592 6C CHRISTOPHER ADAM GARCIA 562-235-7722 H&M 10/30/26, 12:30 PM Asphalt cut to install anodes for socal gas Roberta Costello 851675MW
Metro West 5 U 2026503849 8635 W 3RD ST GEORGE BURNS RD Los Angeles CA 90048 2044134786 632 1J CHRISTOPHER GARCIA 562-235-7722 H&M 10/30/26, 9:00 AM Asphalt cut to install anodes for socal gas Roberta Costello 851673MW
Metro West 5 U 2025850455 570 Mapleton Dr 90024 Holmby Park-Devon, Strathmore, Comstock Ave, et al 632 1C MIGUEL MIRANDA 213-603-1818 LADWP 10/30/26, 12:30 PM disinfecting mainline Roberta Costello 851548MW