Skip to main content

Request an Inspection

Basic Text

Requests for Inspection must be made before 12:00 Noon the day prior to the date of Inspection

Requirements

  • Permit number or work order number
  • Job title
  • Valid USA Dig number
  • Address or location of project will be required information to schedule an inspector.

The Bureau of Contract Administration Dispatch Group is responsible for the daily scheduling of inspections by Contractors and Bureau Inspectors in the Metropolitan, Valley, West Los Angeles, and Harbor areas of the City.

This group is responsible for the scheduling of inspections of Class A and B permits, Cash Contracts, Sewer Connection permits, General Deposit permits, Special Deposit permits, Utility permits Excavation permits, and batch plant inspection throughout the City.

Dispatch also provides inspection schedules for lateral support permits, which are permits to shore up the public right of way when developers are excavating large deep areas for private construction of buildings or garages.

Most of these permits are taken out by the various private developers, water, power, telephone and cable companies that service the City.

Dispatch System Schedule

Please use the dropdown options below and click on "Search" to filter by District, Job Type, Work Order/Permit, or Inspector.

  • The information on this table is accurate as of 12:00 noon the day prior to the date of inspection. On Fridays, this table is updated to show the weekend and Monday schedule and is accurate as of 12:00 noon on that Friday prior to the weekend/Monday.
  • Click on the District dropdown to filter by Metro East, Metro West, or Valley districts.
  • Click on the Job Type dropdown to filter by Materials Control (MC) or Shop Fabrication (SF), or Permit Type.
  • Click on the Inspection Date to filter by Saturday, Sunday, or Monday inspections if needed.
  • Click on the Inspector dropdown to filter by Inspector assigned.
  • Enter Work Order/Permit in the specific input box to filter by Work Order/Permit.
  • Click the "Reset" button to clear filters.

For inspectors, please go to the Dispatch Application for more up-to-date information if needed.

For customers, please go to the Appointment Request page for any requests or information..

District Inspection District Job Type WO/Permit Address Job Title T.B. Map Onsite Contact Time Plant/Work Quantity Unit Inspector Sort descending Material Type Line No.
Metro West 3b B BR403184 9419 airport blvd, los angeles, ca 90045 Airport Blvd From Westchester PWK to 96Th Place 702 4J Jonathan Finkle 949-405-0183 Swinerton 8/10/26, 12:00 AM LAMP - Installation S/L & T/S conduit & Pull Boxes, Potholing, Catch Basin Excavation & Installation - NIGHT WORK 10PM Ryan Persaud (LAX-LAMP) 820074MW
Metro West 3b B BR403184 9217 aiprort blvd, 90045 Airport Blvd From Westchester PWK to 96Th Place 702 4H Jonathan Finkle 949-405-0183 Swinerton 8/10/26, 9:00 PM LAMP - Setting Conduit / CB Install / Potholing for SL Ryan Persaud (LAX-LAMP) 819005MW
Metro East 2c CCI E1909087 812 S Westlake Ave, Los Angeles, CA 90057 Sidewalk Repair Program- Package No. 74 Access Request Acceleration Sites Luis Flores 626-820-8978 Axiom Group 8/10/26, 8:00 AM punchlist work Salvador Vasquez 819927ME
Metro East 4b CCI E1909087 2750 Hostetter St, Los Angeles, CA 90023 Sidewalk Repair Program- Package No. 74 Access Request Acceleration Sites Luis Flores 626-820-8978 Axiom Group 8/10/26, 7:00 AM demo, base, form Salvador Vasquez 819908ME
Metro West 5 CCI E1909086 560 Loring Ave, Los Angeles, CA 90024 Sidewalk Repair Program - Package No. 73: Access Request Acceleration Sites Eladio Veliz 323-482-2874 Geronimo Concrete, Inc 8/10/26, 7:00 AM Saw Cut, Demo, Subgrade, Compaction, Form, Concrete, asphalt Salvador Vasquez 819823MW
Metro West 5 CCI E1909291 8908 Mulholland Drive LOS ANGELES CA 90210 Mulholland Drive (8908) Bulkhead RIGO 661-470-7210 CALEX ENGINEERING 8/10/26, 7:00 AM ASPHALT POUR Samer Hussein 820327MW
Valley 8 CCI SWC08304 3734 Broadlawn Dr, Los Angeles, 90068 Manuel Andrade 818-679-2314 Williams Pipeline Contractors, Inc 8/10/26, 7:00 AM Raise manhole to grade Sergio Acosta 820477VA
Metro West 5 CCI SWC08300 5990 Airdrome St, Los Angeles, CA 90035 Robert Lucero 323-947-5149 Tomovich & Associates 8/10/26, 9:00 AM Sewer repair Sergio Acosta 820270MW
Valley 8 CCI SZC13947 5101 N Zoo Dr, Los Angeles, CA 90027 Austin Gardner 909-402-5126 Spiniello West 8/10/26, 7:00 AM Sewer Rehabilitation. Sergio Mejorado 818716VA
Valley 10 CCI SZC14616 17404 Septo St. Northridge CA 91325 Brad Sorem 562-818-4035 Mike Bubalo Construction 8/10/26, 7:00 AM Install CIPP liner (work is in alley behind address) Skylar Reede 820066VA