Skip to main content

Request an Inspection

Basic Text

Requests for Inspection must be made before 12:00 Noon the day prior to the date of Inspection

Requirements

  • Permit number or work order number
  • Job title
  • Valid USA Dig number
  • Address or location of project will be required information to schedule an inspector.

The Bureau of Contract Administration Dispatch Group is responsible for the daily scheduling of inspections by Contractors and Bureau Inspectors in the Metropolitan, Valley, West Los Angeles, and Harbor areas of the City.

This group is responsible for the scheduling of inspections of Class A and B permits, Cash Contracts, Sewer Connection permits, General Deposit permits, Special Deposit permits, Utility permits Excavation permits, and batch plant inspection throughout the City.

Dispatch also provides inspection schedules for lateral support permits, which are permits to shore up the public right of way when developers are excavating large deep areas for private construction of buildings or garages.

Most of these permits are taken out by the various private developers, water, power, telephone and cable companies that service the City.

Dispatch System Schedule

Please use the dropdown options below and click on "Search" to filter by District, Job Type, Work Order/Permit, or Inspector.

  • The information on this table is accurate as of 12:00 noon the day prior to the date of inspection. On Fridays, this table is updated to show the weekend and Monday schedule and is accurate as of 12:00 noon on that Friday prior to the weekend/Monday.
  • Click on the District dropdown to filter by Metro East, Metro West, or Valley districts.
  • Click on the Job Type dropdown to filter by Materials Control (MC) or Shop Fabrication (SF), or Permit Type.
  • Click on the Inspection Date to filter by Saturday, Sunday, or Monday inspections if needed.
  • Click on the Inspector dropdown to filter by Inspector assigned.
  • Enter Work Order/Permit in the specific input box to filter by Work Order/Permit.
  • Click the "Reset" button to clear filters.

For inspectors, please go to the Dispatch Application for more up-to-date information if needed.

For customers, please go to the Appointment Request page for any requests or information..

District Inspection District Job Type WO/Permit Address Job Title T.B. Map Onsite Contact Time Plant/Work Quantity Unit Inspector Sort descending Material Type Line No.
Metro East 6 B BR004916 2100 E. 102nd Street, Los Angeles, CA 90002 102nd ST. & 103rd ST. BET. LOU DILLON AVE. & JUNIPER ST. (TT-82633-03) 704 5H Tony C. 626-377-0329 Bali Construction 8/12/26, 9:30 AM Bali will continue to slurry and dig drywell connections. Juan (B Permits) Ramirez 820626ME
Metro East 6 B BR005057 9701 s main st Los Angeles ca 90003 Main St. (WS) from 31' to 84' S/O 97th St. (CPC-2022-2560-CU) 704 4C Jose 310-353-6856 Satoh brothers 8/12/26, 8:30 AM CONCRETE POUR / FORMS Juan (B Permits) Ramirez 820382ME
Metro East 6 B BR005020 6300 S Western Ave, Los Angeles, CA 90047 Western Gage Traffic Calming 673 6H Luis Flores 626-820-8978 Axiom Group 8/12/26, 7:00 AM demo, base, form Juan (B Permits) Ramirez 819904ME
Metro East 6 CCI E1908685 E 105th St and Grape St., Los Angeles, CA 90002 Ivan Tiscareno 818-826-4127 PPC Construction, Inc. 8/12/26, 7:00 AM Continue construction of ADA compliant street improvements Keekab Ahn 819809ME
Valley 7 B BR205664 12342 Osborne Pl, Pacoima, CA, 91331 OSBORNE PL (SE/S) 475' TO 615' NE/O OSBORNE ST - (TR 61020/APC 2004-2905) 502 3F Matthew John Smithlin 818-634-2252 JDC Construction 8/12/26, 10:00 AM Curb drain inspection and driveway Kenny Tobar 821683VA
Valley 7 B BR206169 12121 Foothills Blvd., Sylmar, CA 91342 FOOTHILL BLVD (NE/S) CARL STREET TO 342' S/O CARL ST - (CPC-2021-9000) 502 1F Andrew Phillion 314-308-8929 ARCO/Murray Construction 8/12/26, 8:00 AM Remove and replace (2) sidewalk panels that were flagged during the final inspection due to being >2% cross slope. Kenny Tobar 820950VA
Valley 9 CCI E1909300 23064 Cass Avenue, Los Angeles, CA 91364 JESSE MARQUEZ 310-505-6968 Jilk Heavy Construction 8/12/26, 7:30 AM COMPACTION TESTING OF SUBGRADE AND BASE MATERIALS FOR ROADWAY CONSTRUCTION Leslie Rodriguez 819451VA
Valley 9 CCI E1909300 23064 Cass Avenue, Los Angeles, CA 91364 JESSE MARQUEZ 310-505-6968 Jilk Heavy Construction 8/12/26, 7:00 AM CONSTRUCT STREET IMPROVEMENTS Leslie Rodriguez 819448VA
Metro East 2d A 2026001592 4610 N VERDUGO ROAD CA 90065 Ref No : 127296 564 6H Joseph Cancino 424-237-0486 Cancino concrete inc 8/12/26, 8:00 AM Final Ludwin Ortega 820822ME
None None MC BR004121 2626 E 26th St Vernon Ca 90058 Avenue 37 (S/S) from 21' to 83' (EO) Mayfair Dr. (Hillside Ordinance) Minor Navas 818-408-1315 OL Development 8/12/26, 7:00 AM MAT-CON 10 CY Marcus DeBose PCC 821681NO