Skip to main content

Request an Inspection

Basic Text

Requests for Inspection must be made before 12:00 Noon the day prior to the date of Inspection

Requirements

  • Permit number or work order number
  • Job title
  • Valid USA Dig number
  • Address or location of project will be required information to schedule an inspector.

The Bureau of Contract Administration Dispatch Group is responsible for the daily scheduling of inspections by Contractors and Bureau Inspectors in the Metropolitan, Valley, West Los Angeles, and Harbor areas of the City.

This group is responsible for the scheduling of inspections of Class A and B permits, Cash Contracts, Sewer Connection permits, General Deposit permits, Special Deposit permits, Utility permits Excavation permits, and batch plant inspection throughout the City.

Dispatch also provides inspection schedules for lateral support permits, which are permits to shore up the public right of way when developers are excavating large deep areas for private construction of buildings or garages.

Most of these permits are taken out by the various private developers, water, power, telephone and cable companies that service the City.

Dispatch System Schedule

Please use the dropdown options below and click on "Search" to filter by District, Job Type, Work Order/Permit, or Inspector.

  • The information on this table is accurate as of 12:00 noon the day prior to the date of inspection. On Fridays, this table is updated to show the weekend and Monday schedule and is accurate as of 12:00 noon on that Friday prior to the weekend/Monday.
  • Click on the District dropdown to filter by Metro East, Metro West, or Valley districts.
  • Click on the Job Type dropdown to filter by Materials Control (MC) or Shop Fabrication (SF), or Permit Type.
  • Click on the Inspection Date to filter by Saturday, Sunday, or Monday inspections if needed.
  • Click on the Inspector dropdown to filter by Inspector assigned.
  • Enter Work Order/Permit in the specific input box to filter by Work Order/Permit.
  • Click the "Reset" button to clear filters.

For inspectors, please go to the Dispatch Application for more up-to-date information if needed.

For customers, please go to the Appointment Request page for any requests or information..

District Inspection District Job Type WO/Permit Address Job Title T.B. Map Onsite Contact Time Plant/Work Quantity Unit Inspector Sort descending Material Type Line No.
Metro East 2a U 2025504029 4670 Beverly blvd Los Angeles 90005 CUSTOMER-DRIVEN 593 7H Jon Rice 951-756-0934 JMRice 7/10/26, 2:30 PM Vent backfill Mark Klein 806798ME
Metro East 2a U 2026502006 5703 Harold Way Los Angeles CA 90028 2409-DOLPHIN-A-5703HaroldWay 593 4G Jose Gomez 951-609-4378 HP Communications, Inc. 7/10/26, 11:00 AM PRECON Mark Klein 806663ME
Metro East 2a U 2026501798 5701 Hollywood Blvd Los Angeles CA 90028 2409-DOLPHIN-A-5701HollywoodBlvd 593 4G Jose Gomez 951-609-4378 HP Communications, Inc. 7/10/26, 10:00 AM PRECON Mark Klein 806655ME
Metro East 2b U 2026500068 103 N Kingsley dr los angeles ca 90004 Harvard Blvd & E 1st St MLRP 633 1J joseph bailey 213-783-5539 LADWP 7/10/26, 9:00 AM 6" Mainline install, re-taps, paving etc. Mark Klein 806507ME
Metro West 3a U 2026850690 2301 S Bundy Dr, Los Angeles, CA 90064 34.5KV CONDUIT REQUIREMENTS 632 7A Ivan Rojas 424-212-2593 Mark Company 7/10/26, 11:00 AM Trenching & Installing conduit for LADWP line Extension on Tennessee and Amherst. Maximiliano Vasquez 808216MW
Metro West 5 U 2026500044 1062 S. ROBINSON BLVD. WHITWORTH DR. Los Angeles CA 90035 H505 REL 0-1 A05B9PW LTID 49507 (PO #1225068) 632 3J Daniel Camacho 909-367-5291 VCI CONSTRUCTION INC. 7/10/26, 7:00 AM ground bed Maximiliano Vasquez 807587MW
Metro West 5 U 2026850889 10614 CHALON RD STONE CANYON RD Los Angeles CA 90077 FRONTIER BAU P-493114 592 6A FRANCISCO MELGAR 323-392-3486 INLAND ENGINEERING SERVICES 7/10/26, 8:00 AM POTHOLE TO REPAIR CONDUIT Maximiliano Vasquez 807512MW
Metro West 5 U 2026850704 3367 BARBYDELL DR CLUB DR Los Angeles CA 90064 H403 A05BDG5 1 OF 1 IFP REL 0-1 LTID 50608 632 7F MAGID ELDAIR 909-727-1425 VCI CONSTRUCTION 7/10/26, 2:30 PM PL. G. BED Maximiliano Vasquez 807407MW
Metro West 5 U 2026502198 1920 ROBERTSON BLVD SAWYER Los Angeles CA 90034 2043592132 632 5H OCTAVIO CHACON 951-232-7580 SE PIPELINE 7/10/26, 1:30 PM PRE-CON MEETING Maximiliano Vasquez 807393MW
Metro West 5 U 2026851019 1815 S BENECIA AVE LOS ANGELES CA 90025 H208 A05BEAV 1 OF 1 IFP REL 0-1 LTID# 51055 632 3D EDGAR ENAMORADO 909-376-8551 VCI CONSTRUCTION 7/10/26, 9:00 AM PLACE GROUND BED AT POLE JOB #A05BEAV Maximiliano Vasquez 807345MW