Skip to main content

Request an Inspection

Basic Text

Requests for Inspection must be made before 12:00 Noon the day prior to the date of Inspection

Requirements

  • Permit number or work order number
  • Job title
  • Valid USA Dig number
  • Address or location of project will be required information to schedule an inspector.

The Bureau of Contract Administration Dispatch Group is responsible for the daily scheduling of inspections by Contractors and Bureau Inspectors in the Metropolitan, Valley, West Los Angeles, and Harbor areas of the City.

This group is responsible for the scheduling of inspections of Class A and B permits, Cash Contracts, Sewer Connection permits, General Deposit permits, Special Deposit permits, Utility permits Excavation permits, and batch plant inspection throughout the City.

Dispatch also provides inspection schedules for lateral support permits, which are permits to shore up the public right of way when developers are excavating large deep areas for private construction of buildings or garages.

Most of these permits are taken out by the various private developers, water, power, telephone and cable companies that service the City.

Dispatch System Schedule

Please use the dropdown options below and click on "Search" to filter by District, Job Type, Work Order/Permit, or Inspector.

  • The information on this table is accurate as of 12:00 noon the day prior to the date of inspection. On Fridays, this table is updated to show the weekend and Monday schedule and is accurate as of 12:00 noon on that Friday prior to the weekend/Monday.
  • Click on the District dropdown to filter by Metro East, Metro West, or Valley districts.
  • Click on the Job Type dropdown to filter by Materials Control (MC) or Shop Fabrication (SF), or Permit Type.
  • Click on the Inspection Date to filter by Saturday, Sunday, or Monday inspections if needed.
  • Click on the Inspector dropdown to filter by Inspector assigned.
  • Enter Work Order/Permit in the specific input box to filter by Work Order/Permit.
  • Click the "Reset" button to clear filters.

For inspectors, please go to the Dispatch Application for more up-to-date information if needed.

For customers, please go to the Appointment Request page for any requests or information..

District Inspection District Job Type WO/Permit Address Job Title T.B. Map Onsite Contact Time Plant/Work Quantity Unit Inspector Sort descending Material Type Line No.
Metro West 5 A 2026000927 10800 W Chalon Rd, Los Angeles, CA, 90077 Ref No : 126324 591 7J Daniel Cardenas 424-567-2661 Daniel Cardenas 7/6/26, 12:30 PM final Haig Baklayan 804397MW
Metro West 5 A 2025002739 1916 S Garth Ave Los Angeles, CA 90034 Ref No : 121297 632 5J Jonathan Esquivel 213-667-7717 Herbert Flores 7/6/26, 1:30 PM pre construction meeting Haig Baklayan 804371MW
Metro West 5 A 2025002829 2267 N BETTY LANE LOS ANGELES CA 90210 Ref No : 122825 592 3F TONY 818-257-9053 FRONEN 7/6/26, 9:00 AM final only Haig Baklayan 804356MW
Metro West 5 A 2025002821 2267 N BETTY LANE LOS ANGELES CA 90210 Ref No : 122830 592 3F TONY 818-257-9053 FRONEN 7/6/26, 9:00 AM FOR FINAL ONLY Haig Baklayan 804347MW
Metro West 5 SD 2026850003 1637 Viewmont Dr Los Angeles, CA 90069 Ref No : 101283 592 4J William Worthey 562-961-0246 SoCal Sewer & Water 7/6/26, 8:00 AM STORM DRAIN PIPING ENCASEMENT Haig Baklayan 804345MW
Metro West 5 A 2026000679 1422 S Midvale Ave, Los Angeles, CA 90024 Ref No : 125509 632 4B Chayan Orozco 909-573-2944 DiBara Masonry 7/6/26, 11:00 AM pre-inspection Haig Baklayan 804299MW
Metro West 5 A 2026001152 9611 High ridge Dr 90210 Ref No : 126653 592 2D Manny Chaves 213-359-7460 Nandco Construction 7/6/26, 10:00 AM FORMS Haig Baklayan 804108MW
Metro West 5 A 2026000529 2044 N STRADELLA ROAD LOS ANGELES CA 90077 Ref No : 125082 591 3H NISS 213-268-2321 NISS 7/6/26, 9:00 AM FINAL Haig Baklayan 804069MW
Metro West 5 A 2026000762 265 S DENSLOW AVE LOS ANGELES CA 90049 Ref No : 125427 631 1J Alex Griswold 310-261-9140 Alex Griswold 7/6/26, 8:00 AM FINAL Haig Baklayan 804013MW
Metro East 2e CCI SWC08545 5150 Valley Blvd, Los Angeles, CA 90032 Francisco Estrada 818-853-3117 Williams Pipeline Contractors, Inc. 7/6/26, 7:00 AM Spot repair. Htoo Myat 806118ME